Herunterladen Inhalt Inhalt Diese Seite drucken

Operation; Installing The Battery Pack; Starting The Machine - Toro Flex-Force Power System 60V MAX Bedienungsanleitung

Vorschau ausblenden Andere Handbücher für Flex-Force Power System 60V MAX:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 64

Operation

Installing the Battery Pack

1.
Make sure that the vents on the battery are clear
of any dust and debris.
2.
Lift up the battery-compartment lid (A of
9).
3.
Line up the cavity in the battery pack with the
tongue on the machine and slide the battery
pack into the compartment until it lock into place
(B of
Figure
9).
4.
Close the battery-compartment lid (C of
9).
Figure 9

Starting the Machine

1.
Ensure that the battery pack is installed in the
machine; refer to
(page
2.
Insert the electric-start button into the electric
starter (A of
Figure
3.
Squeeze the bail and hold it to the handle (B
and C of
Note:
turn on and the battery-charge indicator lights on
the battery illuminate.
4.
Press the electric-start button until the motor
Figure
starts (D of
g282250
11
Installing the Battery Pack
11).
Figure
10).
Figure
10).
When you squeeze the bail, the lights
Figure
10).
Figure 10
g288479

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

3185331853t

Inhaltsverzeichnis