Herunterladen Inhalt Inhalt Diese Seite drucken

Wall Mounting - Beko BHCB 93640 B Bedienungsanleitung

Vorschau ausblenden Andere Handbücher für BHCB 93640 B:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 17
5
Installation Of Appliance

5.3 Wall Mounting

• Wall must be flat, straight and have the
sufficient bearing capacity.
• Depth of drilling holes must comply with
the length of bolts.
• The bolts and dowels provided are suitable
for brick walls. For other construction
material (e.g. drywall, plate, porous
concrete), suitable fixing dowels and nuts
shall be used.
F
(Figure 7)
CAUTION
A
Before drilling, ensure that there
are no power, gas or water pipes
in the close proximity of the
drilling locations.
Draw a mid location line from the ceiling per-
pendicular to the lower edge of the hood ().
Fix the assembly scheme on the wall. For
points A and B, take the maximum dimen-
sions of the hood as reference, and drill points
A and B you have marked with a Ø6mm drill
bit, and tap Ø6mm plastic wall plugs. Install
12 / EN
the chimney connection plate to the wall with
2 pieces of 3.9x22 screws (Figure 8).
To install the hood body, drill points C,D,E ,F
specified in the installation template with a
Ø10mm drill bit and tap Ø10mm plastic dow-
els to these points (Figure 8).
Install 2 pieces of 5.5x60 mounting screws to
points C and D with a clearance of 5 mm be-
tween the screw head and the wall (Figure 8).
(Figure 8)
4x
Ø10m m
Install two pieces of hanging plates to the
body of the hood with M5x35 mounting
screws (Figure 8).
(Figure 9)
Cooker Hood / User Manual

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Bhcb 93640 bh

Inhaltsverzeichnis