Herunterladen Inhalt Inhalt Diese Seite drucken

Commissioning, Operation; Mechanical Mounting - WIKA O-10 Betriebsanleitung

Vorschau ausblenden Andere Handbücher für O-10:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

6. Commissioning, operation

6. Commissioning, operation
CAUTION!
Prior to commissioning, the pressure sensor must be subjected to a visual inspection.
EN
Leaking fluid is indicative of damage.
Only use the pressure sensor if it is in perfect condition with respect to safety.
CAUTION!
The model O-10 (T) pressure sensor must not be exposed to any condensation.

6.1 Mechanical mounting

Required tool: Open-ended spanner (spanner width 24)
The sealing faces at the instrument have to be undamaged and clean.
When screwing the instrument in, the force required to do this must not be
applied through the casing, but only through the spanner flats provided for
this purpose and using a suitable tool.
When screwing in, do not cross the threads.
For information on tapped holes and welding sockets, see Technical
information IN 00.14 at www.wika.com.
22
All manuals and user guides at all-guides.com
WIKA operating instructions pressure sensor, model O-10
Spanner flats

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis