Herunterladen Inhalt Inhalt Diese Seite drucken

Installing The Sauna Control Unit; Connecting Wires - Sentiotec A2-9 Montage- Und Gebrauchsanweisung

Saunasteuerung
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
Installation instructions, for professionals only

4.1. Installing the sauna control unit

Refer to Fig. 1 (page 11).
1. Press the clip lock 6 lightly using a screwdriver and remove
the cover from the housing.
2. Screw one cross-head screw (20 mm) into the wall of the sauna
at a height of approx. 1.70 m with a clearance of up to 7 mm.
3. Hang the sauna control unit onto the cross-head screw using
the attachment device c as an aid.
4. Guide the sensor wires through the cable bushing 4.
5. For the optional door monitor only:
Guide the wires for the door monitor through the cable bushing 2.
6. Guide the heater, power supply and light cables through the cable
bushing 7.
7. Screw two cross-head screws (20 mm) into the lower fastening
holes 3 and 8.
8. Ensure that the sauna control unit is fitted securely.

4.2. Connecting wires

Refer to Fig. 1 (page 11) and Fig. 3 (page 17).
1. Connect the white wire for the sensor heater to terminal F1 on the
terminal strip 1; it is not necessary to ensure correct polarity.
2. Connect the red wire for the sensor heater to terminal TS on the terminal
strip 1; it is not necessary to ensure correct polarity.
3. For the optional door monitor only:
Remove the jumper wire from the terminal DR on the terminal strip 1
and connect the wires for the door monitor.
4. For the optional bench sensor only:
Remove the jumper wire from terminal F2 to terminal strip 1 and clamp on
the lines of the bench sensor; it is not necessary to ensure correct polarity.
5. Connect the heater, power supply and light cables (Fig. 3) to the terminal
strip 9 in accordance with the connection diagram.
WORLD OF WELLNESS
p. 10/28

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

O-a2-9

Inhaltsverzeichnis