Herunterladen Inhalt Inhalt Diese Seite drucken

Fume Ducts - Ferroli ENERGY TOP W 70 Betriebs-, Installations- Und Wartungsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

2.6 Fume ducts

The unit is a "C type" with sealed chamber and forced draught; the air inlet and fume outlet must be connected to one
of the extraction/inlet systems indicated below. The unit is approved to work with all the Cxy and Bxy flue configurations
given on the dataplate (some configurations are given by way of example in this section). Some configurations, howev-
er, may be expressly limited or not permitted by local regulations, standards or laws. Before proceeding with installation,
check and carefully observe the relevant prescriptions. Also comply with the provisions concerning the positioning of
wall and/or roof terminals and the minimum distances from windows, walls, ventilation openings, etc.
B
A
To prevent deformations, leave an expansion space of approx. 2 ÷ 4 mm for every metre of pipe.
16
Downloaded from
www.Manualslib.com
This C-type unit must be installed using the inlet and fume exhaust ducts supplied by the manufacturer in con-
formity with UNI-CIG 7129/92. Failure to use them automatically invalidates every warranty and relieves the
manufacturer of any liability.
For fume ducts longer than 1 m, during installation take in account the natural expansion of the materials when
the boiler is operating.
2 ÷ 4 mm
manuals search engine
fig. 19 - Expansion
cod. 3540M640 - 07/2008 (Rev. 00)
ENERGY TOP W 70
EN

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis