INSTALLATION GUIDE
The following positions are not allowed.
5>
<5
Charging base left and right slope should be no more than 5 degree angle.
We recommend to keep 2 meters straight wire ahead leading into the charging station. If
your lawn soil is soft and uneven, we suggest to use 0.5*1m plastic net in front of charging
base to avoid the rear wheel digging into the soil ahead of.
Once the position of the Charging station is confirmed and mains electrical connection is
also can be reached, please do not connect to main power yet. First you need to finish all
boundary layout work, and then after that, you can connect to the main power.
25