Herunterladen Inhalt Inhalt Diese Seite drucken

Technical Information - Vision Aqua Verdanium Home Gebrauchsanleitung

Vorschau ausblenden Andere Handbücher für Verdanium Home:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Remove the second PP filter unit and the GAC post-filter from the Verdanium Home in the same way.
After removing all old filter cartridges mount the new pre- and post-filters into the filter heads in reverse
order.
Press the new filter cartridges into the filter heads of the Verdanium Home and turn them 90 ° clockwise.
Once the new filters are installed you can close the housing again and screw-on the cover. Please do not
use excessive force when tightening the screws.
Reconnect the Verdanium Home again to the withdrawal tap and any other connected devices, the water
supply and the drain. Restore the power supply and turn on the Verdanium Home.
Return the Verdanium Home to its original location. Please note the distance to the back wall of the cabi-
net should not be less than 5 cm.
Open the water supply to the unit and check the Hydro-Stopper and its battery.
Do not use rechargeable batteries in the Hydro-Stopper, just use one AA LR 6 Alkaline Battery which does
not discharge by itself and lasts in the Hydro-Stopper without any problems for one year.
7.1 Re-commissioning after filter change
After each filter change or re-installation, the system must be put back into operation. Please select in the
operating mode menu IB program - commissioning program.
Navigate with the (+) or (–) button to select the operating mode
Press the OK-Button.
OPERATING MODE:
Select display
with "+" or "-"
This operating mode (IB program) always assumes that the Verdanium Home is correctly connected. The
water inlet and the withdrawal tap must be open.
50
Instruction Manual – Verdanium Home – Ver. 1.1.4 – 11.2020
IB-PROGRAMM
Button
ESC ←
→ OK
During the first phase of re-commissioning the Verdanium Home will rinse the pre-filters.
Filter rinse
Automatic
ESC ←
030%
When rinsing the membranes, the disinfectant is removed from the membrane and is drained into the
wastewater connection.
During the last phase of re-commissioning, the ultra-pure water side of the membranes and the post-fil-
ters are rinsed.
Permeate rinse
Automatic
ESC ←
060%
When the IB program is completed and the extraction tap is open, the Verdanium Home changes automa-
tically to permeate production. The Verdanium Home is now ready for use.

8. Technical Information

Replacement Filters
VA-Standard PP – Sediment Filter Cartridge 10" (pre-filter)
VA-Standard GAC – Activated Carbon Granulate-Cartridge 10" (post-filter)
VA-Standard CTO – Activated Carbon Block-Cartridge 10" (post-filter) optio-
nal
Packaging Content
1 x Verdanium Home (without accessories)
2 x VA-Standard PP – Sediment Filter Cartridge 10" (pre-filter)
1 x VA-Standard GAC – Aktivated Carbon Granulate-Cartridge 10" (post-filter)
Power cord, Europe CEE 7/7 to C13
Technical Data | Verdanium Home
Measurements | Weight
Width: 248 mm, Hight: 397 mm, Depth: 359 mm (32 cdm) | 15,1 kg
(without accessories)
Temperature | Operating Pressure
Minimum 4°C (39°F) to maximum 38°C (100°F) | Minimum 1,4 bar
(20 psi) to maximum 5,5 bar (80 psi)
Ultra-pure Water Production
At 6°C input temperature and 3,5 bar approx. 1,75 l/min (up to 2,3
l/min at higher temperatures)
Ultra-pure Water / Wastewater Ratio Depending on the ultra-pure water production the ratio is 1 : 0,8
Water Connections
Water supply 3/8" JG connection – Waste Water 1/4" JG connec-
tion – Ultra-pure water 1/4" JG connection
Electrical Connection
230VAC - 50Hz – 180VA – (110VAC – 60Hz optionally possible)
Instruction Manual – Verdanium Home – Ver. 1.1.4 – 11.2020
Membrane rinse
ESC ←
090%
PERMEATE PRODUCTION
device in operation
ESC ←
Item number
1000066
1000068
1000067
51

Werbung

Kapitel

Inhaltsverzeichnis
loading

Inhaltsverzeichnis