Herunterladen Inhalt Inhalt Diese Seite drucken

Controls; Control Buttons; Display; Interface - Vision Aqua Verdanium Home Gebrauchsanleitung

Vorschau ausblenden Andere Handbücher für Verdanium Home:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

4. Controls

4.1 Control buttons

The Verdanium Home is controlled by using the keypad. The following functions are available:
- System activation
- System deactivation
- Check system operation time
- Reset filter change interval

4.2 Display

The display shows various functions and operating status of the Verdanium Home:
- Status of the system
- Information about filter change
- Rinsing times
- Operating times
- Error messages

4.3 Interface

The interface can be used to update the software of the Verdanium Home.
Please note that this interface is only to be accessed by authorized service providers.
Any interference with the control system irrevocably leads to the loss of warranty.
44
Instruction Manual – Verdanium Home – Ver. 1.1.4 – 11.2020

5. First commissioning

5.1 Commissioning

After installation, the system must be put into operation. Please select in the operation mode menu the
IB program (commissioning program).
Navigate with the ( + ) or ( – ) buttons to select the operation mode,
Press the OK-Button.
OPERATING MODE:
Select display
with "+" or "-"
This operating mode (IB program) assumes that the Verdanium Home is correctly connected. The water
inlet and the withdrawal tap must be open.
During the first phase of commissioning the Verdanium Home will rinse the pre-filters.
Filter rinse
Automatic
ESC ←
030%
When rinsing the membranes, the disinfectant is removed from the membrane and is drained into the
waste-water tube connection.
During the last phase of commissioning, the ultra-pure water side of the membranes and the post-filters
are rinsed.
Permeate rinse
Automatic
ESC ←
060%
When the IB program is completed and the extraction tap is open, the Verdanium Home changes automa-
tically to permeate production. Continue operating the Verdanium Home for additional 7 - 10 minutes to
flush out any remaining disinfectant residues.
The Verdanium Home is now ready for use.
Instruction Manual – Verdanium Home – Ver. 1.1.4 – 11.2020
IB-PROGRAM
Button
ESC ←
→ OK
Membrane rinse
ESC ←
090%
PERMEATE PRODUCTION
Device in operation
ESC ←
45

Werbung

Kapitel

Inhaltsverzeichnis
loading

Inhaltsverzeichnis