4.0 Transport Installation
Assembly Dismantling
WARNING:
Read and understand the entire contents of this manual
before attempting assembly or operation. Failure to
comply may cause serious injury.
4.1 Machine Transport
The machine needs to be moved in its own packing. Use a
forklift truck to place it.
4.2 Installation Requirements
- Main voltage and frequency must comply with the
machine's motor requirements.
- Ambient temperature should fall within –10°C to +50°C.
- Relative humidity may not be over 90%.
4.3 Unpacking and clean-up
Remove all contents from shipping crate and compare
parts to the contents list in this manual. If shipping damage
or any part shortages are identified, contact your
distributor. Do not discard crate or packing material until
the machine is assembled and running satisfactorily.
Clean all rust protected surfaces with kerosene or a light
solvent. Do not use lacquer thinner, paint thinner or
gasoline, as these can damage plastic components and
painted surfaces.
4.4 Shipping contents
1
Metal band saw
1
Bar-stop rod
1
Roll-supporting arm
1
Owner's manual
4.5 Anchoring the machine
The machine is designed to operate in closed rooms.
Position the machine on a firm cement floor maintaining,
at the rear, a minimum distance of 800 mm from the wall.
Lift machine off the pallet to the desired location.
Use lifting straps and place them as shown in Fig. 2-1.
WARNING:
The machine weight is 677 kg
Assure the sufficient load capacity and proper condition
of your lifting devises. Never step underneath suspended
loads.
Anchor machine to the ground, using screws and
expansion plugs or tie rods sunk in cement, ensuring that
it is sitting level.
Figure 2-2: Anchor bolts
4.6 Assembly of Loose Parts
Install the components supplied:
1)
Mount the bar-stop rod
2)
Mount the roll-supporting arm and align as per the
vise bed.
11
Figure 2-1: Machine lifting