For frame R8: Install the common mode filter. For instructions, see Common
mode filter kit for frames R7 and R8 (option +E208) installation guide
(3AXD50000015179 [English]).
7. Frame R6 types -046A-4 and greater: Cut tabs in the shroud for the installed
cables. Frame R8: Install the side plates if removed. Knock out holes in the
shroud for the input cables. See figure
8. Frames R6 and R8: Install the shroud on the power cable terminals. See figure
...F (R6, R8)
on page 121.
9. Secure the cables outside the drive mechanically.
G – Connect the control cables
Procedure:
1. Remove the front cover(s) if not already removed.
2. Frame R3: Lift the control panel holder up. See figure
3. Cut an adequate hole into the rubber grommet and slide the grommet onto the
cable. Slide the cable through a hole in the bottom plate and attach the grommet
to the hole. Attach the unused grommets to holes cone pointing downwards.
4. Route the cables. Frame R3: See figure
Frame R6: See figure
on page 122.
5. Ground the outer shield of the cable 360 degrees under the grounding clamp.
Keep the cable unstripped as close to the terminals of the control board as
possible.
6. Secure the cables inside the drive mechanically.
7. Ground the pair-cable shields and grounding wire at the grounding terminal (SCR)
of the control unit.
8. Connect the conductors to the appropriate terminals of the control unit. See
Default IO connection diagram
9. Wire the optional modules if included in the delivery. See the option module user's
manual or installation guide.
10. Secure the cables outside the drive mechanically.
Note:
• Leave the other ends of the control cable shields unconnected.
• Keep any signal wire pairs twisted as close to the terminals as possible.
...F (R6, R8)
...G (R3)...
...G (R6)...
on page 122. Frame R8: See figure
on page 9.
EN – Quick installation guide 7
on page 121.
G (R3)...
on page 121.
on page 121.
EN
DA
DE
ES
FI
FR
...G (R8)...
IT
NL
PL
PT
RU
SV
TR
ZH

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Ach580-31

Inhaltsverzeichnis