Herunterladen Inhalt Inhalt Diese Seite drucken

Installation; Preparation - G&D DP-Vision-IP-Fiber-Serie Installation Und Bedienung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Installation

Installation
IMPORTANT:
The devices use components with laser technology which comply
with laser class 1.
They meet the requirements in accordance to
U.S. CFR 1040.10
and
Consider the following safety guidelines regarding this matter:
 Avoid direct eye exposure to beam on page 4
 Always connect optical connections or cover them with protection caps on page 4

Preparation

IMPORTANT:
When choosing a location for the devices, please ensure to comply
with the ambient temperature limit (see Technical data on page 68 ff.) close to the
device. The ambient temperature limit must not be influenced by other devices.
IMPORTANT:
Do not cover the ventilation openings. For reasons of electric safety,
mount device variants pthat provide ventilation openings only horizontally.
Please refrain from using devices with ventilation openings in dusty environ-
ments. Dust in the housing can damage the electronics and may cause failures.
1. Ensure that the computer to be connected to the computer module is switched
off. If the computer is provided with keyboard and mouse, unplug the cables of
the input devices from the interfaces.
2. Place the computer module (
NOTE:
Please mind the maximum cable length of five meters between the com-
puter module and the computer to be connected.
3. Place the user module (
NOTE:
Please mind the maximum cable length of five meters between the user
module and the devices of the user console.
4. Take the supplied cables and have them ready for the installation of the devices.
7 · G&D DP-Vision-IP-Fiber
1040.11
.
DP-Vision-IP-Fiber-CPU
DP-Vision-IP-Fiber-CON
EN 60825-1:2014
as well as
) close to the computer.
) close to the remote console.

Werbung

Kapitel

Inhaltsverzeichnis
loading

Inhaltsverzeichnis