Herunterladen Inhalt Inhalt Diese Seite drucken

Leister TWINNY S Bedienungsanleitung Seite 20

Vorschau ausblenden Andere Handbücher für TWINNY S:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

WELDING
Welding preparation
• Check :
– Laying out of material
– Mains supply
– Cable to mains
Operating conditions
• Attach guide bar (14) or guide handle (15).
• Move the hot air blower (3) out and lift up until it locks.
• Connect the tool to the mains.
• Adjust welding parameters, see page 21.
20
Downloaded from
www.Manualslib.com
Width of overlap 80 mm to 125 mm
Geomembrane liners must be clean between
the overlap as well as above and below
at least 5 kW (generator)
supplied with an RCCB
a minimum cable cross section in
accordance with the table
230 V~
120 V~
manuals search engine
to 50 m
2 x1,5 mm
to 100 m
2x2,5 mm
to 50 m
2x1,5 mm
to 100 m
2x2,5 mm
2
/ 2 x14 AWG
2
/ 2 x12 AWG
2
/ 2 x14 AWG
2
/ 2 x12 AWG

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis