Herunterladen Inhalt Inhalt Diese Seite drucken

Conel CLEAR FILL Montage- Und Betriebsanleitung Seite 40

Füllstation
Vorschau ausblenden Andere Handbücher für CLEAR FILL:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

40
5.4.2
SOFTENING/DESALINATION BOTTLE (LARGE)
Installation
/
Close upstream shut-off valve and downstream ball valve!
/
Remove the cap from the new resin bottle.
/
Insert the nozzle tube of the resin bottle into the connection fitting as far as it will go.
/
Screw the connection fitting into the resin bottle.
/
Screw the adapter of the connection kit (with the connected pressure hoses) into the heating circuit
filling station from below.
/
Ensure proper fit of the two greased O-rings!
/
Connect the free ends of the two pressure hoses with the connection fitting to the resin bottle (plug
connection).
/
Observe the IN/OUT coding!
/
Secure the plug connection with clips.
5.4.3
BLEEDING
/
Remove the two insulation shells.
Make sure that no water drips onto the electronic components when bleeding the
unit. Turn the bleeding hose if necessary (see fig. 3)!
/
Completely open upstream shut-off valve.
/
Open the sampling valve of the heating circuit filling station using a flat-head screwdriver or bleeding
tool.
/
The unit is bled as soon as water starts running out of the bleeding hose.
/
Close the sampling valve of the heating circuit filling station again.
/
Put the insulation shells back in place.

Quicklinks ausblenden:

Werbung

Kapitel

Inhaltsverzeichnis
loading

Inhaltsverzeichnis