Herunterladen Inhalt Inhalt Diese Seite drucken

Dimensions; Installation; Installation Requirements - Galletti ART-U Serie Installations-, Bedienungs- Und Wartungsanleitung

Designer-gebläsekonvektor mit verkleidung reduzierter tiefe und bldc-motor 1-4kw
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 39
4

DIMENSIONS

Figure 11.4 p. 65  shows ART-U dimensional data and position of plumbing connections.
5

INSTALLATION

WARNING:
unit installation and start-up must be entrusted
to competent personnel and performed in a workmanlike
manner, in accordance with current regulations.
For each unit an (IL) switch should be mounted on the power
supply, with opening contacts at a distance of at least 3 mm
and a suitable protection fuse (F) .
WARNING:
Install the unit, circuit breaker (IL) and/or any re-
mote controls in a place out of reach of persons who may be
taking a bath or shower.
WARNING:
the EMC filters connected to frequency con-
verters (inverters) can create leakage currents toward

INSTALLATION REQUIREMENTS

The fan coils should be installed in a position where the room
can be cooled or heated evenly, on walls able to withstand their
weight.
It is advisable to install any accessories on the standard unit pri-
or to positioning the latter.
For installation and use of accessories, please refer to the relative
technical sheets.
Install any remote control panel in an easily accessible position
allowing the user to set the functions while ensuring an accurate
reading of the ambient temperature, if provided.
Avoid therefore:
Ū positions directly exposed to sunlight;
Ū positions exposed to direct currents of warm or cold air
Ū placing obstacles that impede an accurate temperature
reading
The water connections are on the left side, viewing the unit
from the front.
Hydraulic connections on the opposite side are available on-
ly on order
The water connection pipes must pass through the slots
pro-vided on the rear panel of the unit (depending on the L
or R version, use the appropriate slot), see figure 11.4 p. 65 .
NB:
The positioning of the water probe, if present, can be of
two types:
1. If the machine is equipped with a valve kit, the water probe
must be fixed in the appropriate probe holder (a small cop-
per pipe), as shown in the accessory's instructions
2. If the machine is NOT equipped with a valve kit, the water
probe, made available on the side of the hydraulic connec-
tions, must be fixed on the INLET water pipe by means of the
special probe holder (a small copper socket) filled with con-
ductive paste. Finally, the probe must be properly insulated
to ensure that it reads the water temperature correctly.
NB:
The air probe, if present, must be fixed in the lower part
of the unit, under the motor support bracket, using the sup-
plied adhesive probe holder
NOTE: the electrical wiring must always be positioned on the
opposite side of the plumbing connections.
Make the plumbing connections to the heat exchanger and,
where the cooling function is to be used, to the condensate
22
ART-U
ground (in order to make the unit EMC compliant, by re-
ducing conducted emissions on power supply line). De-
pending on installation site, this can force the cut out of the
differential safety switch. It is recommended to install a sepa-
rate differential safety switch, only for the BLDC unit, with an
adjustable threshold for the cut out current.
WARNING: base unit must be protect by original packaging
to avoid demage at the worksite, before cabinet installation.
WARNING: keep the cabinet inside the original packaging
until the finally installation
drainage outlet.
It is recommended to connect the installation intake to the up-
per part of the heat exchanger and the return to the bottom part
of it.
Bleed air from the exchanger by means of the air vent valves
(hexagonal wrench type 10) situated beside the plumbing con-
nections of the exchanger. See figure 11.5 p. 66.
NOTE:
When the fan coil is supplied with the valve, it is man-
datory to ensure adequate thermal insulation of the valve
body and the hydraulic connections that make up the kit.
In the case of a 3-way valve, it is necessary to use either the
GIVKL (water connections on the left side) or GIVKR (water
connections on the right side) insulating shell.
To favour the drainage of condensate, the drain hose should be
inclined downward, at least 3 cm/m; make sure that no loops or
bends form along its path.
WARNING:
In normal operation, particularly with the fan at minimum
speed and ambient air with high relative humidity, conden-
sation may form on the air outlet and on some external parts
of the unit.
To avoid such issues while always remaining within the oper-
ating limits envisaged for the unit, it is necessary to limit the
inlet temperature of the water inside the heat exchanger. In
particular, the difference between the air dew point (T
and the inlet water temperature (T
°C, according to the following relationship: TW>TA,DP-14
°C
Example: in the case of ambient air at 25 ° C with 75% rela-
tive humidity, the dew point temperature is about 20 ° C and
therefore the inlet temperature of the water in the battery
must be greater then:
Ū 20-14 = 6 °C in order to avoid condensation on a fancoil
equipped with a valve.
Ū 20-12 = 8 °C If the valve kit accessory can not be installed.
,D
)
A
P
) must NOT exceed 14
W

Werbung

Inhaltsverzeichnis

Fehlerbehebung

loading

Diese Anleitung auch für:

Art-u 10Art-u 20Art-u 30Art-u 40Art-u 50

Inhaltsverzeichnis