Herunterladen Inhalt Inhalt Diese Seite drucken

Switching The Pump On - BADU 90 Eco Motion Pumpendatenblatt

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 131
Start-up
Pos : 90 /T echnisc he Dokumentation/Betriebsanl eitung/Inbetri ebnahme/Pumpe ei nsc halten @ 0\mod_1427962694084_370.doc x @ 27343 @ 2 @ 1
6.3

Switching the pump on

Pre-requisites:
Strainer basket is installed, where applicable.
Lid is fitted securely.
1.
Open the valve on the intake side completely.
2.
Only open the valve on the delivery side halfway.
N O T IC E
The pump can be damaged if it runs dry!
Purge air from the pump and suction line.
3.
Switch the pump/unit on.
N O T IC E
If the pump has a three-phase motor and it turns in the wrong
direction, the pump/unit is louder and has a lower capacity.
4.
For three-phase motors: Ensure that the motor turns in the
direction of the arrow labeled on the fan hood. If the motor
rotates in the wrong direction, notify an electrician.
5.
As soon as full speed is reached, open the valve on the
delivery side completely.
6.
Check the mechanical seal for leaking.
Pos : 91 /T echnisc he Dokumentation/Allgemei ne Module/#### Sei tenumbruch #### @ 0\mod_1426069111812_0.doc x @ 891 @ @ 1
22 EN
10|2015

Werbung

Inhaltsverzeichnis

Fehlerbehebung

loading

Inhaltsverzeichnis