Installation
5.4

Electrical connection

W A R N IN G
Risk of electric shock due to incorrect connections!
Electrical connections must always be carried out by
authorised specialists.
Observe VDE and utility company regulations.
Install swimming pools and their protection according to
DIN VDE 0100-702.
Install a disconnecting device with at least a 3 mm contact
gap per pole to interrupt the power supply.
W A R N IN G
Risk of electric shock due to voltage on the housing!
A built-in or external overload switch which is set correctly
must be installed for pumps with three-phase or A.C. motors
without motor protection (see pump data sheet). In doing so,
observe the values on the motor name plate.
Protect power supply with a ground fault circuit interrupter,
nominal residual current I
Only use suitable pipe types according to regional
regulations.
Adjust minimum diameter of the pipes to accommodate the
motor output and pipe length.
If hazardous situations can occur, provide emergency off
switch according to DIN EN 809. The builder/operator must
make a decision according to this standard.
Connection by customer:
– Fuse protection 1-phase 230 V/3-phase 400 V safety fuse
16 A time delay or 16 A circuit breaker
Pos : 85 /T echnisc he Dokumentation/Allgemei ne Module/#### Sei tenumbruch #### @ 0\mod_1426069111812_0.doc x @ 891 @ @ 1
20 EN
≤ 30 mA.