Herunterladen Inhalt Inhalt Diese Seite drucken

Installing The Pump And Connecting It To The Pipe - BADU 90 Eco Motion Pumpendatenblatt

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 131
Pos : 82 /T echnisc he Dokumentation/Betriebsanl eitung/Installation/Aufstellung/Pumpe aufstellen und an die Rohrleitung ansc hließ en @ 0\mod_1427897347705_370.doc x @ 27258 @ 3 @ 1
5.3.1

Installing the pump and connecting it to the pipe

1.
Install the pump in a horizontal and dry position. When doing
so, pay attention to the maximum distance to the water level,
i.e. geodetic height. See pump data sheet.
N O T IC E
The motor can be damaged due to insufficient drainage!
Do not block or seal the drain gap between the pump housing
and the motor.
N O T IC E
If it is sealed incorrectly, the thread can be damaged and the
sealing effect can be reduced!
Depending on the pump type, teflon tape or the unions enclosed
are used to install the pipe.
For ABS bonding, a curing time of at least 12 hours must be
observed.
N O T IC E
The pump can be damaged by unauthorised mechanical strains
being placed on the pump!
Take the pipe up directly before the pump and connect it free
of tension.
2.
Connect the pipe free of tension according to the VDMA
standard sheet 24277. Compensators must be installed for
pipe diameters of 90 mm or larger. They are recommended
for diameters of 75 mm.
3.
Ensure that any leaks cannot cause consequential damage.
Install a suitable retainer if necessary.
W A R N IN G
Pumping medium hazardous to health!
Observe legal regulations regarding the disposal of media
hazardous to health.
Pos : 84 /T echnisc he Dokumentation/Betriebsanl eitung/Installation/Elektrischer Ansc hl uss/allgemei ne Anl eitungEl ektrisc her Ansc hluss @ 2\mod_1435143493499_370.doc x @ 33592 @ 2 @ 1
10|2015
Installation
EN 19

Werbung

Inhaltsverzeichnis

Fehlerbehebung

loading

Inhaltsverzeichnis