Herunterladen Inhalt Inhalt Diese Seite drucken

Extraordinary Maintenance - CAME F500 Installationsanleitung

Vorschau ausblenden Andere Handbücher für F500:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 38
9.3 Maintenance
Periodic maintenance
Before doing any maintenance, cut off the power supply, to prevent any hazardous situations caused by accidentally activating the operator.
Periodic maintenance log kept by users (every six months)
Date

9.4 Extraordinary maintenance

The following table is for logging any extraordinary maintenance jobs, repairs and improvements performed by specialized contractors.
 Any extraordinary maintenance jobs must be done only by specialized technicians.
Extraordinary maintenance log
Installer's stamp
Job carried out ______________________________________________________________________________________
_________________________________________________________________________________________________
_________________________________________________________________________________________________
Installer's stamp
Job carried out ______________________________________________________________________________________
_________________________________________________________________________________________________
_________________________________________________________________________________________________
Notes
Product name
Date of job
Technician's signature
Customer's signature
Product name
Date of job
Technician's signature
Customer's signature
Signature

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

F510

Inhaltsverzeichnis