Initial start-up

3.1

Installation

The sensors are to be mounted in such a way that the sample medium
flows directly across the sensor surface. Any other installation position of
the sensors may create the risk of formation of airlocks, or of contamination
through deposits of solid matter.
Flow
direction
Flow of medium must be across the face of the sensor. Air bubbles and
solid matter deposits are to be avoided. A minimum clearance of 30 mm
(1.18") between sensor end and pipe wall must be maintained (see dra-
wing above).
Vertical mounting (top entry) in a pipe is recommended only if the pipe is
full and no air bubbles are able to develop in the flow.
In the event of side mounting (side entry) of the sensor, vertical upward
flow of sample process medium must be ensured.
InPro 7100-VP Series
52 002 092
Flow direction
T-piece
© 10 /12 Mettler-Toledo AG, CH - 8606 Greifensee
InPro 7100-VP Series
Sensor
Printed in USA

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis