Herunterladen Diese Seite drucken

Additional Parameters For Devices With Solar Adaptation; Commissioning - Siemens WFx6 Bedienungs- Und Montageanleitung

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 48
Additional parameters for devices with integrated M-Bus
(not add-on modules)
Primary addresses for heat, cold, impulse 1, impulse 2 L4

Additional parameters for devices with solar adaptation

Share of glycol or brine

Commissioning

• Open the ball valves, switch the heating on and open the radiator valve.
• Check the installation or airtightness and direction o o
• Seal the temperature sensor and o metering element to protect it rom
manipulation.
• Remove the installation cover from the meter housing.
• Note the installation date, the meter numbers, any seal numbers, the old and
new meter statuses.
• Dispose of the used device in accordance with national regulations.
Siemens Building Technologies
Level
L3
A6V10816676_----_d
Display
109
EN

Werbung

loading

Diese Anleitung auch für:

Wfx5Wmx5Wfz662