Herunterladen Inhalt Inhalt Diese Seite drucken

Test Operation; Installation/Servicing Tools - Toshiba RAS-M10SMUV-E Installations-Handbuch

Air conditioner (split type)
Vorschau ausblenden Andere Handbücher für RAS-M10SMUV-E:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 53

10 TEST OPERATION

Check and test operation
Be sure to test the piping connections for gas leak.
• Check the flare nut connections, valve stem cap connections
and service port cap connections for gas leak with a leak
detector or soap water.
Test operation
• To test the system, push and hold RESET button for 10 sec. (There will be one short beep.)

11 INSTALLATION/SERVICING TOOLS

Tools
Tools
Gauge manifold
Charge hose
Electronic balance
for refrigerant
charging
Torque wrench
(nominal diam. 1/2,
5/8)
: Newly prepared (They are special requirements for R410A, separated from those for R22.)
" : Existing tools are available.
For the details of the tools, refer to the Installation manual of the outdoor unit.
Applicable to R22 model
"
• Service port cap connection
• Valve stem cap connection
Tools
"
Flare tool (clutch
type)
Gauge for
projection
adjustment
"
Vacuum pump
adapter
Gas leakage
detector
23
Flare nut connections
(Indoor unit)
Flare nut connections
(Outdoor unit)
Applicable to R22 model
EN

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Ras-m16smucv-eRas-m16smuv-eRas-m13smucv-e

Inhaltsverzeichnis