Herunterladen Inhalt Inhalt Diese Seite drucken

Installation Check-Up - Faema E61 Jubile Gebrauch Und Installation

Vorschau ausblenden Andere Handbücher für E61 Jubile:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 50

6. Installation Check-up

WARNING:
AFTER INSTALLATION, CHECK TO SEE IF THE MACHINE IS WORKING PROPERLY (see the
Installation Module C)
WATER CONNECTIONS
No leaks from the connections or tubes
FUNCTIONING
Boiler and operating pressures are normal.
The pressure gauge is working properly.
The self-leveling device is working properly.
The expansion valves are working properly
WARNING: ONCE THE MACHINE HAS BEEN INSTALLED AND IS READY FOR USE, BEFORE ALLOWING THE
WORKER TO START USING THE MACHINE, WASH THE INTERNAL COMPONENTS ACCORDING TO THE
INSTRUCTIONS BELOW:
GROUPS
Hook up the filter holders to the groups (without coffee).
Let each group dispense water for about a minute.
HOT WATER
Continuously dispense hot water (pressing the appropriate button) until at least 4 liters of water have been used for a
machine with 1 group, 6 liters for a machine with 2 groups and 9 liters for a machine with 3 groups (see the "Cleaning and
Maintenance" Chapter in the User's Manual).
STEAM
Dispense steam from the nozzles for about a minute, using the appropriate buttons.
25

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis