Copying test routine into local
database
1. Close the CRS 845 guard doors.
2. Insert the "EP software" CD in the CD/DVD drive.
3. In the "component test - main menu" start screen,
select <F7>.
 A password request appears.
4. Enter the password in the input line:
5. Confirm your entry by pressing <F12>.
6. Select the menu option "System >> Data backup".
7. Press <F12> to continue.
8. In the Selection of destination field, select the drive
"D:\ (CD-ROM)".
 The test routines 0445020105 C4 and
0445020105 C5 are displayed in the Component
target location field.
9. Select the test procedures 0445020105 C4 and
0445020105 C5 in the Destination components box.
10. Copy the selected test routines to the local drive by
pressing <F5>.
11. Exit the "Data backup" window by pressing <Esc>.
�.5
Calling up and running calibration
test routine
1. In the "Configuration" window, select the Calibra-
tion >> Rail pressure sensor menu option.
 The "Rail pressure sensor calibration" window
opens.
 The serial number and calibration date of the
reference pressure sensor are displayed in the
External pressure sensor field.
2. In the "Rail pressure sensor calibration" window,
press <F7>.
 Pressure sensor calibration is now active.
i
Pressure sensor calibration can only be canceled by
closing the EPS 945 system software.
3. Press <F12> to continue.
4. Quit the menu by pressing <Esc>.
 The system software reinitializes the devices.
5. In the "Injection component test main menu" start
screen select <F12>.
 Displaying legal information. (Page 1 of 2)
6. Read legal information carefully and adhere to under
all circumstances.
7. Continue with <F12>.
 Displaying legal information. (Page 2 of 2)
8. Read legal information carefully and adhere to under
all circumstances.
9. Continue with <F12>.
Robert Bosch GmbH
Calibrating the high-pressure rail | CRI�CRI� ���� | �1
10. In the "Type number" input field enter the numbers
0445020105 .
11. Press <F2> to open the "Database" menu.
12. Select the "Search for components" menu option.
 The "Component selection Local database"
13. Select test routine for pressure sensor calibration
1958
0445020105 C4 and open with <F12>.
14. Call up the "Measurement display" window with
<F12>.
 The "Attention" dialog box opens with the maxi-
15. Continue with <F12>.
 The measurement display opens.
16. On the EPS control unit, switch on the converter
and the test oil pump (see Pos. 5).
17. Enable the controller (Pos. 1).
18. Switch on the test oil heater (Pos. 4).
5
4
Fig. 23:
1 ON/OFF switch for controller enable
2 ON/OFF switch for lubricating oil pump
3 Emergency stop switch
4 ON/OFF switch for test oil heater
5 ON/OFF switch for converter and test oil pump
19. Press <F�> to start the pump test.
 The EPS drive starts up.
20. Adjust the inlet pressure for the high-pressure
pump on the pressure-control valve.
"
The test bench is ready for operation.
CRI�CRI� ���� | �1
selection window appears.
mum speed.
I
I
1
0
0
I
I
2
0
0
3
458763-10Pal
Control unit
1 689 978 562
| �1
en
|
2012-03-29