Herunterladen Inhalt Inhalt Diese Seite drucken

Grundfos UPE 2000 FZ Series Montage- Und Betriebsanleitung Seite 7

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 28
Assembly
1. Mount the new control box bottom on the power head. See fig. 6.
Check that the gasket is positioned correctly. See fig. 7.
Be careful not to damage the motor cable.
Refer to section Wiring diagram in the general installation and operating
instructions.
2. Remove the two rubber plugs. See fig. 6.
3. Fit and tighten the two screws. See fig. 5.
4. Mount the PCB, fit and tighten the five screws. See fig. 4.
5. Connect the motor cable including screen and PE lead. See fig. 8.
6. Enter the leads into the control box bottom via the cable entries.
7. Connect all the leads in the same positions as before dismantling.
8. Mount the cover, fit and tighten the four screws. See fig. 2.
9. Twin-head pumps:
Follow the instructions given in section 8. Configuration of twin-head
pumps in order to obtain the right configuration.
The pump is now ready for operation.
See section 9. Start-up.
7

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Uped 80-120 fz

Inhaltsverzeichnis