Herunterladen Inhalt Inhalt Diese Seite drucken

Toshiba HWS-455XWHM3-E Installationshandbuch Seite 44

Vorschau ausblenden Andere Handbücher für HWS-455XWHM3-E:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Hydro Unit
(2) Press the [
or Data, then press the [
set the value.
FC No.
FIX
(3)Press the [
43-EN
] / [
] button to select FC number
] / [
Floor drying
Data
] button. The set value is registered.
To start the operation
] button to
(1) Press the [
drying" on the FIELD SETTING MENU, then press
the [
(2) Press the [
press the [
• Check the total days for Floor drying operation, then
press [
appears on the Top screen.
(3) Start the heating operation on the top screen.
• Then ZONE1 mark blinks during Floor drying
operation and lapsed days are displayed.
• If some abnormalities occur during Floor drying
operation, the System stops and Alarm history
screen is displayed.
• After heating operation is stopped by operating the
remote controller during Floor drying operation, if
heating operation is again started within 30 minutes,
Floor drying operation is started from the time of
stopping.
– 43 –
Installation Manual
] / [
] button to select "Floor
] button.
FIELD SETTING MENU(1/2)
Test mode
Floor drying
Forced defrosting
Information input
Alarm history
SET
] button to select the ON, then
] button.
Floor drying
ON
OFF
FIX
] button. The
mark and
ZONE1
HOT WATER
HOT WATER
HEAT/COOL
mark
MON

Werbung

Inhaltsverzeichnis

Fehlerbehebung

loading

Inhaltsverzeichnis