Using the cleaning set
Milling instrument chucks
Installing the block clamping nut
B
4
2.
Push the chuck gasket onto the chuck.
Installing the block clamping nut
1.
Place the block clamping nut on the block axle so that the opening in
chuck A lines up with the pins of block fastener B.
2.
Turn the block clamping nut clockwise (approx. 3 rotations).
A
1.4
Milling instrument chucks
CAUTION
Be aware of existing instrument chucks.
Only grease the thread when milling instruments with instrument chucks are
used. Do not grease the thread when using milling instruments without
chucks.
NOTICE
For CEREC MC XL: Once a month
For inLab MC XL: Once a week or after every 4th water change
Clean the chucks of the milling instruments and grease the threads.
✔
The motors are in the position for changing the milling instruments (burs).
Sirona Dental Systems GmbH
Using the cleaning set CEREC MC XL, inLab MC XL
D 3439.103.01.07.02 02.2010
61 77 161 D 3439