Herunterladen Inhalt Inhalt Diese Seite drucken

Toshiba RAV-SM402MUT-E Installations-Handbuch Seite 9

Vorschau ausblenden Andere Handbücher für RAV-SM402MUT-E:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 64
Dimensional view
1000 or more
Obstacle
1000 or more
Space required for
installation and servicing
Knockout for flesh
air intake Ø100
145.5
Bottom face
93
of ceiling
105
70
Ø162
For branch duct knockout
square hole Ø150
Bottom face of ceiling
595 to 660 Ceiling open dimension
142
64
368.5
700 Panel external dimension
595 to 660 Ceiling open dimension
525 Hanging bolt pitch
320.5
Electric parts box
575 External unit dimension
Check port
(
450)
Drain-up standing-up size
Indoor unit
Note)
As ABS is used for the drain discharge port of the main unit,
the vinyl chloride paste cannot be used.
Use the flexible hose (Band fix) included in the package.
• Wired remote
controller
(RBC-AMT32E)
Drain discharge port
Hanging bolt
M10 or W3/8
local arrange
Ø162
Refrigerant pipe
(Liquid) Ø6.4
For branch duct
knockout square
hole Ø150
Refrigerant pipe
(Gas) Ø12.7
8
200
Check port
(
450)
Check port
(
450)
Bottom face
of ceiling
4
120
268
27
220.5
145.5
Bottom face
134
of ceiling
63
Ceiling panel
Wiring connection
port
55
70
105
93
139.5
190.5
English-8
16

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis