Herunterladen Inhalt Inhalt Diese Seite drucken

Installation - Wilo EMU RZP 20-1 Einbau- Und Betriebsanleitung

Inhaltsverzeichnis

Werbung

en
4.1
Attachment point
Fig. 2: Attachment point EMU RZP
5

Installation

5.1
Installation types
5.2
Stationary installation at the dis-
charge pipe
Fig. 3: Stationary installation
36
Installation
▪ Attach lifting equipment directly to the flow housing.
▪ Lifting equipment must have a rope thimble.
NOTICE! Do not use shackles!
▪ Use the slotted holes to adjust the centre of gravity. Inclination angle of the recircula-
tion pump: approx. 5° downward.
Attaching the lifting equipment
1. Loosen the hexagon nut at the bolt.
2. Pull out the bolt and remove the plastic sleeve.
3. Attach the lifting equipment to the bolt.
4. Fit the plastic sleeve.
⇒ Lifting equipment attached at the bolt between two plastic sleeves.
5. Insert bolt into the hole and tighten with the hexagon nut.
▶ Lifting equipment is attached.
▪ Stationary at the discharge pipe
▪ Flexible installation with lowering device
NOTICE! Operation at different heights and directions is not possible!
The recirculation pump is fitted with a flange at the flow ring for direct installation at
the discharge pipe. The pump is attached to the flange of the discharge pipe using
technically approved screws. All work may only be performed when the basin is empty.
Hoisting gear, e.g. forklift
Transport space for lifting the pump
Scaffolding
Fixation material
1. Position the pump on the transport space and secure against slipping and falling
over.
2. Lift the pump and position at the discharge pipe.
3. Attach the pump to the discharge pipe.
NOTICE! Ensure that the screws are the correct strength.
4.
Lead the connection cable out of the basin keeping it slightly taut.CAUTION! The
connection cable must not get pulled into the propeller!
▶ Pump is installed. Make the electrical connection.
WILO SE 2018-07

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis