Herunterladen Inhalt Inhalt Diese Seite drucken

Instruction / Handover - Kessel SonicControl Anleitung Für Einbau, Bedienung Und Wartung

Fettschichtdickenmessgerät
Vorschau ausblenden Andere Handbücher für SonicControl:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
5.1 Getting the system ready for opera-
tion
Plug the mains plug of the control unit into the
}
socket. The system will initialise automatical-
ly. During initial initialisation of the system, the
control unit requests four basic settings.
1. Language
Correct enter
necessary for
2. Date/time
measuring
3. Type of system*
4. Type of grease separator*
if the type of fat is not known, enter 60% of
vegetable.
➤ Selection using
➤ Stored in system memory by pressing "OK"
➤ After setting 1 to 4.
➤ Switch unit loads program memory
➤ Start operating mode
➤ System is ready for operation
* see page 29
5. Operation
5.2 Operator's duties Checking
- for transport or installation damage
- for structural defects of all electrical
and mechanical components for seat and
function
- the cable connections
Customer instruction based on the in-
stallation and operating instructions
- Go through installation and operating in-
structions with the customer
- System
operation
(explaining
describing)
- Explanation to the customer about the ope-
rator's duties
- Remind about regular servicing (see
chapter 6)
55

5.3 Instruction / handover

The chapter "Safety instructions" must
be heeded (page 4)!
Commissioning is carried out by a specialised
firm or by an authorised KESSEL agent (at an
additional charge). The following persons
should be present for the handover:
- Person authorised to perform the accep-
tance on behalf of the building owner
- Specialised firm
and
In addition, we recommend the participation
of operating personnel/operator and the
waste disposal contractor.
Summary of instruction:
- Get the system ready for operation
- Check the system
- Instruction based on the installation and
operating instructions
- Preparation of the handover certificate (see
chapter 13)
➤ Once instruction is completed, the system
must be made ready for operation.

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis