Herunterladen Inhalt Inhalt Diese Seite drucken

Check List - EdilKamin IDROPELLBOX Installations-, Betriebs- Und Wartungsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 86
POSSIBLE TROUBLESHOOTING
8 ) Signalling: H2O TEMPALARM
Problem:
Shuts down due to water temperature being higher than 90 °C.
An excessive temperature may occur because of the following:
• system too small: ask the DEALER to activate the ECO function
• blockage: clean the exchanger pipes, the combustion chamber and the smoke outlet.
9) Signalling: Veri c./air ow: (intervenes if the ow sensor detects insuf cient combustion ).
Problem:
Turns off for lack of depression
• Flow may be insuf cient if there is a hatch open or the hatch is not perfectly sealed (e.g. seal awed).
• This may also be the case if there is a problem with air intake or smoke extraction, or if the
• combustion chamber is blocked or the ow sensor dirty (clean with dry air).
• Also check that the ow sensor limits are within the parameters.
• The depression alarm may also be signalled during ignition, if the chimney ue does not comply with
• speci cations or the chimney ue and chimney pot are clogged.
10) Signalling: "Battery check"
Problem:
The boiler- replace does not stop but the error appears on the display.
Actions:
• The buffer battery of the control board needs changing (DEALER).
11) Problem:
Remote control not working
Actions:
• closer to the receiver of the boiler- replace
• check the battery and if necessary, replace it.
12) Problem:
synoptic panel is off:
Actions:
• check the power cable connection,
• check fuse (on power cable),
• check connection of at cable to synoptic panel
13) Problem:
Water is not hot enough:
Actions:
• clean the hearth exchanger
NOTA
All signals/warnings remain shown until you intervene on the remote control, by pressing the button 0/1.
Do not use the boiler- replace before having eliminated the problem.
It is important to tell the Dealer exactly what the panel signals.
To be integrated with a complete reading of the technical speci cations
Positioning and installing
• Commissioned by a quali ed DEALER who has issued the warranty and maintenance manual
• Room ventilation
• Only the boiler- replace outlet passes through the smoke channel/chimney ue
• The smoke channel has: a maximum of 2 curves, a maximum 2 horizontal metres
• Chimney pot that is high enough to avoid downdraft areas
• The discharge pipes are made of a suitable material (stainless steel is recommended)
• When using any ammable materials (e.g. wood), all precautions have been taken to prevent a re hazard
Use
• Good quality, dry pellets are used
• The chimney pot and ash compartment are clean and well positioned
• The door is closed properly
• The combustion chamber is inserted properly into the relevant compartment
REMEMBER TO VACUUM THE COMBUSTION CHAMBER BEFORE EACH IGNITION
Should ignition fail, DO NOT re-ignite until you have emptied the combustion chamber.

CHECK LIST

- 42
-

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis