Herunterladen Diese Seite drucken

Prior To Installation; Installation - Jøtul I 520 Handbuch

Vorschau ausblenden Andere Handbücher für I 520:

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 40
ENGLISH
3.6 Steel chimney
If a top-mounted steel chimney is used, a semi-insulated
chimney must be installed all the way down to the top of
the surround.
Fig. 2
Then fit the steel chimney in accordance with the operating
instructions.
The fireplace must be connected to a chimney and flue
pipe approved for solid fuel fireplaces with a flue gas
temperature of 305 °C.
The cross-section of the chimney must be at least that
of the flue pipe. Ø 150 mm.
Several solid fuel products can be connected to the
same chimney system if the chimney cross-section
is adequate. Contact your local building authorities
regarding restrictions and installation requirements.
The chimney must be connected in accordance with the
installation instructions of the chimney supplier.
Make sure that the flue pipe rises all the way up to
the chimney.
Please note that it is extremely important for connections
to have a degree of
The recommended chimney draft is 16 - 18 Pa.

4.0 Prior to installation

Before installing the fireplace, check it carefully for any
signs of damage.
The product is heavy! Ask someone to help you when
positioning and installing it.
Read the installation and operating instructions for Jøtul
I 520 (cat. no. 10044945 and Jøtul FS 175 (cat. no.
10050310) carefully before installing the fireplace!
4.1 Prior to installation
The basic product comes in two packages:
Burn chamber.
Soapstone units with mounting sections.
NB: Check the product for signs of damage when you
unpack it.
32
flexibility.
Preparations
Before installation, it is necessary to decide:
Where the smoke outlet is to be located.
Possible use and location of external air supply.
Refer to manuals for installation of the parts.
Smoke outlet
Before starting installation work, decide whether a rear or
top outlet will be used. The product is delivered from the
factory with the smoke bell positioned for a top outlet.
4.2 Preparation of burn chamber
NB: Before installing the fireplace, check it carefully
for any signs of damage.
someone to help you when positioning and installing it.
Read the installation and operating instructions for Jøtul I
520 (cat. no. 10044945).

5.0 Installation

NB: The base must be level with max. 1 mm/m tolerance.
This is extremely important to ensure that the rest of the
installation is correct.
Important!
Bear in mind that the soapstones may be damaged if they
are handled roughly. Do not knock the mounting brackets
too hard. Installation should be carried out by a qualified
person.
Useful tools during installation.
Fig. 3
Installation drawings:
Page 46
The product is heavy! Ask

Werbung

loading

Diese Anleitung auch für:

Fs 175