Herunterladen Inhalt Inhalt Diese Seite drucken

Helios KWL EC 220 D Bedienungsanleitung Seite 37

Vorschau ausblenden Andere Handbücher für KWL EC 220 D:
Inhaltsverzeichnis

Werbung

Operating instructions
Stage 1 – Reduced ventilation
Stage 2 – Nominal ventilation
Stage 3 – Intensive ventilation
Stage 4 – Maximum ventilation
Adjustment and Starting Up – easyControls
Step 10
The calculated control voltage is now entered in the unit control system in the desired nominal ventilation
stage (Fig 7):
1. Web browser (example)
http://www.easycontrols.net
Factory settings
Navigation menu:
>> "Initial start-up"
Step 11
Repeat steps 8 to 10 to determine the required control voltage for reduced ventilation and intensive
ventilation according to the air volume calculation and to set the corresponding operating stage.
2. Comfort controller KWL-BEC
7
GB

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis