Herunterladen Inhalt Inhalt Diese Seite drucken

Helios KWL EC 220 D Bedienungsanleitung Seite 34

Vorschau ausblenden Andere Handbücher für KWL EC 220 D:
Inhaltsverzeichnis

Werbung

Operating instructions
GB
IMPORTANT ☞
Adjustment and Starting Up – easyControls
Step 3:
Measurement of the static resistance of the duct system by measuring the pressure differential between
the supply air and outside air, and between the extract air and outgoing air directly after the connecting
parts of the ventilation unit (Fig.2).
Detailed description regarding measurement see "Helios Planning Manual" (No. 94 731)
TIP
All ventilation valves in the duct system must be completely opened!
(Supply air poppet valve min. 10 turns, extract air poppet valve min. 12 turns)
Step 4:
The measured pressure loss (e.g. between extract air and outgoing air) is the static unit resistance and is
entered in the corresponding diagram (extract air in this case) on the set fan performance curve. The
actual volume flow is read out (Fig.3).
4

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis