Operating instructions
GB
Adjustment and Starting Up – easyControls
Step 8
The desired volume flow is then plotted on the outlined unit performance curve (Fig.6).
Step 9
As the performance curves presented in the diagram were created for the described voltages, interim
values in the 1/10 range between the steps above the graphic can be determined by approximation
methods and thus the required target voltage for nominal ventilation can be adapted (Fig.7).
6