Herunterladen Inhalt Inhalt Diese Seite drucken

Establishing Connections En; Mf1, Cable Assembly & M-Drive En; M-Drive - Abicor Binzel MFS-V3 Betriebsanleitung

Vorschau ausblenden Andere Handbücher für MFS-V3:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

6 Putting into operation
6.2 Establishing connections
6.3 M-Drive & eBOX
Establish the connections as shown in the following diagram:
1
5
1
Port for control lead X46
Fig. 3
M-Drive &eBOX
6.4 MF1, cable assembly & M-Drive
Establish the connections as shown in the following diagram:
1
2
11
1
MF1 drive unit
2
Motor control lead
3
VTS cable assembly
Fig. 4
Standard & masterfeeder M-Drive
NOTICE
• Ensure that the coolant supply and return hoses have been correctly installed.
• We recommend using BTC-50 coolant; suitable for use at up to 50°C.
• To ensure the maximum cooling capacity, check the condition of the coolant regularly.
EN - 10
2
4
2
Port for control lead X11
3
10
4
Motor control lead
5
Air-blast hose
6
Coolant supply hose (blue)
Coolant supply = blue, coolant return = red
3
eBOX
4
Control lead
4
5
6
9
7

M-Drive

8
Coolant return hose (red)
9
Control lead for wire actual
value encoder
M-Drive
3
5
M-Drive
7
8
10 Wire inlet tube
11 Control lead for wire
actual value encoder

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

M-drive

Inhaltsverzeichnis