Herunterladen Inhalt Inhalt Diese Seite drucken

Initial Commissioning - walterscheid SW41 Bedienungsanleitung

Sonderwerkzeug gelenkmontage
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

5

Initial Commissioning

1. Set the special tool (1) down on a
stable work surface.
2. Bolt the mounting plate firmly at all 4
corners (2) to a worktop.
3. Connect the compressed air connection
(1) of the foot switch to an external
compressed air system (2). The input
air pressure of the external compressed
air system must not be less than 8 bar
and must not exceed 10 bar.
The special tool is ready for use.
INITIAL COMMISSIONING
The special tool is prepared as standard for the direct
connection to an external compressed air system.
Ensure that the coupling sleeve on the coupling connector
locks into place.
Fig. 8
Fig. 9
32

Werbung

Inhaltsverzeichnis
loading

Verwandte Produkte für walterscheid SW41

Inhaltsverzeichnis