Herunterladen Inhalt Inhalt Diese Seite drucken

Mains Connection; Storage Battery Operation (Optional) - KERN KIB-TM Betriebs Und Installationsanleitung

Version 1.1 2018-02
Vorschau ausblenden Andere Handbücher für KIB-TM:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

6.7 Mains connection

Select a country-specific power plug and insert it in the mains adapter.
Check, whether the voltage acceptance on the scales is set correctly.
Do not connect the scales to the power mains unless the information on
the scales (sticker) matches the local mains voltage.
Only use KERN original mains adapter. Using other makes requires
consent by KERN.
Important:
Before starting your weighing balance, check the mains cable for
damage.
Ensure that the power unit does not come into contact with liquids.
Ensure access to mains plug at all times.

6.8 Storage battery operation (optional)

Before the first use, the battery should be charged by connecting it to the mains
power supply for at least 12 hours.
If the weight display shows the flashing symbol
capacity of the rechargeable battery is almost exhausted. Charge the battery with the
help of the supplied power pack.
14
, this is an indication that the
KIB-TM-BA_IA-e-1811

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis