Herunterladen Inhalt Inhalt Diese Seite drucken

Power Supply; Initial Start-Up; Handover; Specification - STIEBEL ELTRON MHG 65 E Bedienung Und Installation

Natursteinheizung mhg / mhj / mhs / mhp / mhv / sph serie
Vorschau ausblenden Andere Handbücher für MHG 65 E:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

INSTALLATION

Initial start-up

11.2 Power supply

Only connect the natural stone heater to an alternating voltage
of 230 V / 50 Hz.
Material losses
!
Only shorten the power cable far enough to be able to
hang the natural stone heater without disconnecting the
power cable.
L
N
PE
12. Initial start-up
Material losses
!
When heating up the natural stone heater for the first
time, observe a maximum heat-up time of 20 minutes.
Then let the panel cool down for at least 60 minutes.
f Perform this process one more time.
f
In the first two days of use, heat up the natural stone heater step-
by-step to the required room temperature. This way, you avoid
hairline cracks. If hairline cracks do develop, these are harmless
and do not impair the function or the safety of the natural stone
heater.

13. Handover

f Explain the functions of the appliance to the user. Draw spe-
f
cial attention to the safety instructions.
f Hand over the operating and installation instructions to the
f
user.
www.stiebel-eltron.com
MHG; MHJ; MHS;
MHP; MHV; SPH

14. Specification

14.1 Dimensions and connections

B
a

14.2 Minimum clearances

MHG, MHJ, MHS, MHP, MHV, SPH |
70
40
230 V
23 23
17

Werbung

Inhaltsverzeichnis

Fehlerbehebung

loading

Inhaltsverzeichnis