Herunterladen Inhalt Inhalt Diese Seite drucken

Vortice VORT PROMETEO HR 400 Betriebsanleitung Seite 24

Vorschau ausblenden Andere Handbücher für VORT PROMETEO HR 400:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 56
ENGLISH
4 4
During
the
course
condensation collects on the bottom of the apparatus.
In order to draw it away the small piping provided must
be fixed to the attachment on the underside of the
appliance (fig.5), and connected to a drainpipe. (for
instructions please see the Assembly paragraph).
5 5
The appliance must be easily accessible in case of
servicing/maintenance. In particular a free space of at
least 50 cm must be left in front of the front panel, to
facilitate cleaning and replacement of the heat
exchanger and filters.
Checks on delivery
Check the appliance on delivery, to detect any faults
before
proceeding
specifically:
firstly proceed with extracting it from the packaging,
ensuring that the name and description shown on the
box correspond:
once the appliance has been removed from the
packaging, verify that no visible damage is present, then
ensure that the small drain pipe for the condensation is
24
of
its
normal
functioning,
with
the
installation.
present together with the instruction manual.
Assembly
The appliance comes equipped with two metal brackets
for vertical wall mounting and 4 supports for horizontal
positioning. The equipment required for the fastening of
the brackets is however not provided.
Establish the exact position where the apparatus is to
be
located,
requirements.
Vertical mounting on brackets
Fix the brackets to the wall, using appropriate wall
anchors (fig.6,7,8).
6 6
7 7
More
bearing
in
mind
the
installation

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis