Herunterladen Inhalt Inhalt Diese Seite drucken

Unpacking And Inspection Of The Scope Of Delivery; Installation - Dometic MCS T6 Montageanleitung

Bootsklimaanlage
Vorschau ausblenden Andere Handbücher für MCS T6:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 33
MCS T6, MCS T12, MCS T16
7
Unpacking and inspection of the scope of
delivery
➤ Check all items against the packing list to ensure all cartons have been
received.
➤ Move units in the normal "up" orientation as indicated by the arrows on each
carton.
➤ Examine cartons for shipping damage, removing the units from the cartons if
necessary.
➤ If the unit is damaged, the carrier should make the proper notation on the
delivery receipt acknowledging the damage.
8

Installation

!
CAUTION! Danger of injury
The system may only be installed by qualified personnel from a specialist com-
pany. The following information is intended for technicians who are familiar
with the guidelines and safety precautions to be applied.
• Plan all connections which must be made including
– ducting,
– condensate drain,
– seawater in and out,
– electrical power connections,
– location of control,
– seawater pump placement,
to assure easy access for routing and servicing.
I
NOTE
Review the following notes prior to and after installation.
EN

Unpacking and inspection of the scope of delivery

17

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis

Fehlerbehebung

loading

Diese Anleitung auch für:

Mcs t16Mcs t12

Inhaltsverzeichnis