Starting initial commissioning
1.
2.
The items are described separately below.
1.
code flashes.
2.
PowerSet code.
3.
4.
code is highlighted.
5.
the PowerSet code.
6.
Language
1.
2.
Press SET. The language is adopted.
3.
Press ESC. The check list is shown.
Date format
1.
2.
3.
Date
1. Press SET. The date flashes.
2.
3. Press SET. The change is adopted.
4.
5. Repeat steps 1 to 3 for the month.
6.
7. Repeat steps 1 to 3 for the year.
8. Press ESC. The check list is shown.
Time format
1.
2. Press SET. The time format is adopted.
3. Press ESC. The check list is shown.
Time
1. Press SET. The hour display flashes.
2.
3. Press SET. The change is adopted.
4.
5. Repeat steps 1 to 3 for the minutes.
6. Press ESC. The check list is shown.
Country selection
Advice
The country can only be set once!
1.
2.
3.
is displayed.
4.
performing steps 1 and 2 or press
SET for a longer period of time (> 1 s) to con-
firm the currently selected country. The check
list is shown.
Press
to select a check list item.
Press SET to call up the item.
Press SET. The first digit of the PowerSet
Press
to change the first digit of the
Press SET. The change is adopted.
Press
. The second digit of the PowerSet
Repeat steps 1 to 3 for the second digit of
Press ESC. The check list is shown.
Press to select a display language.
Press
to select a date format.
Press SET. The date format is adopted.
Press ESC. The check list is shown.
Press to change the day.
Press . The month is selected.
Press . The year is selected.
Press to select a time format.
Press to change the hour.
Press . The minutes are selected.
Press
to select a country.
Press SET.
Press ESC. The dialogue shown on the left
Press ESC to select a different country by
Reactive power characteristic curve
1.
2.
3.
Number of nodes
1.
2.
3.
4.
Node n
1.
Advice: P% cannot be changed at the first and last
nodes (000%,100%).
2.
3.
4.
5.
6.
Display characteristic curve
1.
2.
Finish
√ Finish has been selected in the check list
and SET has been pressed.
One of 2 possible dialogues is displayed.
1.
• Dialogue Settings are incomplete: Press SET and
• Dialogue Are all settings correct?
2.
5.4.8
Switching on the DC supply
Set the DC circuit breaker on the inverter to position I
(Figure 30). After testing via the internal MSD (approx.
2 minutes), the power fed into the grid can be shown on
the display (assuming that sunlight is present).
5.4.9
De-installing the inverter
Danger
Risk of death by electrocution!
Only technical professionals may perform the work described in section
De-installing the inverter.
Observe the warning notes in 5.4.1.
10
Press
to select the reactive power
characteristic curve type corresponding to the
local regulations.
Press SET. The reactive power characteris-
tic curve type is adopted.
Press ESC. The check list is shown.
Press SET. The value flashes.
Press
to change the number of nodes.
Press SET. The value is adopted.
Press ESC. The check list is shown.
Press
to select a parameter for the node.
Press SET. The parameter value flashes.
Press
to change the value.
Press SET. The change is adopted.
If necessary repeat steps 1 to 4 for the other
parameters.
Press ESC. The check list is shown.
The previously set reactive power characte-
ristic curve is displayed graphically (example in
Fig. left).
Press ESC. The check list is shown.
Proceed as follows, depending on the dialogue.
work through the open items in the check list.
Press ESC to correct settings or press
SET for a longer period of time (> 1 s) to finish
initial commissioning.
If SET is pressed for a longer time then the
inverter restarts and synchronises itself with
the grid (Fig. left).
Figure 30