Herunterladen Inhalt Inhalt Diese Seite drucken

Startup; Unit With Suction System; Unit With Upper Hopper (5 Litres); High Pressure Hose And Spray Gun - WAGNER Finish 270 Betriebsanleitung

Airless-hochdruck spritzgerät
Vorschau ausblenden Andere Handbücher für Finish 270:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Finish 270 / 250
4

StARtuP

4.1

unIt WItH SuctIOn SySteM

1. Unscrew the dust protective cap (Item 1).
2. Ensure that the sealing surfaces of the connections are
clean.
Ensure that the red inlet (2) is inserted in the coating ma-
terial inlet (5).
3. Use the enclosed 41 mm wrench to screw the union nut
(3) at the suction hose (4) onto the coating material inlet
(5) and tighten it.
4. Screw the union nut (6) at the return hose (7) to the con-
nection (8) (22mm).
4.2

unIt WItH uPPeR HOPPeR (5 lItReS)

1. Unscrew the dust protective cap (Item 1).
2. Ensure that the sealing surfaces of the connections are
clean.
Ensure that the red inlet (2) is inserted in the coating ma-
terial inlet (5).
3. Screw the union nut (6) on the return pipe (7) onto the
connection (8).
3. Hang the return pipe (7) into the hopper and screw the
upper hopper (9) onto the coating material inlet (5).
if using hopper with cleaning ring (topclean) step 5 and 6
5. Fix TopClean on hopper upside
6. Plug in return pipe into TopClean and screw on union nut
4.3

HIGH PReSSuRe HOSe And SPRAy Gun

1. Screw the high pressure hose (10) onto the hose connec-
tion
2. Screw the spray gun (11) onto the high pressure hose
3. Tighten all union nuts on high pressure hose so that no
coating material can escape.
4. Screw the tip holder with the selected tip onto the spray
gun, align tip and tighten union nut.
When unscrewing the high pressure hose,
hold firmly on the hose connection with a
22mm wrench.
4.4

cOnnectIOn tO tHe MAInS netWORk

Connection must always be carried out via
an appropriately grounded safety outlet with
residual-current-operated circuit-breaker.
Before connecting the unit to the mains supply, ensure that
the line voltage matches that specified on the unit's rating
plate.
11
10
9
8
7
6
1
3
2
5
8
7
4
GB
startup
39

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Finish 250

Inhaltsverzeichnis