Herunterladen Inhalt Inhalt Diese Seite drucken

Tunze 7097 Gebrauchsanleitung Seite 52

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

sequential" – simple sequential pump circuit
"
The sequential pump circuit is particularly recommended for long tanks, and should be operated with at least 3 pumps,
because otherwise no pump sequence will be clearly identifiable. The Turbelle
pumps should be arranged in line, in
®
order to generate a strong wave front with swelling water movement.
In the field "mode", click on the "sequential" button.
Set the "sequential" switching time by clicking on 1 to 10 sec.
In the field "power control", the pump performance "low power" and "high power" can be set to the same value for every
output (between 20% and 100%) by clicking on the same value. This will also deactivate the wave motion simulation
for each output.
102
103

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis