Herunterladen Inhalt Inhalt Diese Seite drucken

Environmentally Responsible Disposal - Maico ECA 11 E Montage- Und Betriebsanleitung

Vorschau ausblenden Andere Handbücher für ECA 11 E:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
12.2 Wall installation (Fig. C1 and C2),
ceiling installation (Fig. D and E)
NOTICE
Damage to unit/functional problems
in the event of rubbing impeller [11].
 Do not twist or squash housing [1] when
installing.
Danger of short-circuits/damage to unit
when installing on wall as a result of
build-up of condensation in fan housing.
 Thermally insulate ventilation ducts in a
professional manner.
1. Align housing [1] and slide into ventilation
duct. Note the air flow direction: Air
extraction (Fig. C1) / ventilation (Fig. C2).
Airstream and rotational direction are
marked on the fan housing by arrows
(Fig. F, pos. P).
2. In the case of ceiling installation, secure
the fan against falling with 3 screws
(Fig E). Suitable mounting material is to
be supplied by the customer.
3. Fit protection against accidental contact,
for example protective grille SGR 100.
13. Start-up
1. Switch the mains fuse on. Remove
warning sign.
2. Run function test.
14. Maintenance
The unit is maintenance-free.
15. Cleaning
1. Switch off mains fuse, secure against
being accidentally switched back on and
position a visible warning sign.
2. Remove all layers of dust and dirt from the
top and inside of the ventilation duct.
Do not use aggressive cleaning
agents.
16. Fault rectification
Call on the services of a trained electrician
any time there is a fault.
Fault
Cause, measure
Fan does
No mains voltage.
not switch on.
1.
Fan does
Impeller is blocked.
not switch on.
2.
Motor's thermal
Motor too hot.
overload
1.
protection
switches the
2.
fan off.
3.
4.
17. Dismantling
Dismantling may only be undertaken
by a trained electrician ( chap. 3).
18. Environmentally responsible
disposal
The unit and the packaging contain parts that
can be recycled, and should not end up in the
domestic waste.
Dispose of the packaging material in an
environmentally-friendly way, in compliance
with the regulations valid in the country where
you are.
At the end of its service life, dispose of the
unit in an environmentally-friendly way, in
compliance with the regulations valid in the
country where you are.
12. Mounting │ UK
Check whether the
mains fuse has failed.
Switch on if necessary.
Check impeller. Clean it
if necessary.
Put the on/off switch in
the Off position.
Wait until motor and
temperature limiter have
cooled. Cool-down time
can be up
to 10 minutes.
Put the on/off switch in
the On position.
If the fault persists, call
on the services of a
trained electrician.
11

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis