Herunterladen Inhalt Inhalt Diese Seite drucken

Technical Data; Before Starting The Equipment; Connecting To Earth - HERKULES HSE 5000 DD Originalbetriebsanleitung

Diesel-stromerzeuger
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
Anleitung_HSE_5000_DD_SPK7__ 12.10.2016 06:21 Seite 14
GB

5. Technical data

Generator
Protection type
Continuous power S1 4200 W/400 V; 3000 W/230 V
Maximum power S2 (max. 5 min)
Continuous power S1 (12 V d.c.)
Rated voltage
2x 230V~/1x 400V~/1x 12V d. c.
Rated current
13 A (230V~) / 6.1 A (400V 3~)
Frequency
Displacement
Motor rating
Fuel
Tank capacity
Engine oil:
Weight
Sound pressure level L
pA
Sound power level L
:
WA
K uncertainty
Power factor cos ϕ:
Power class:
Max. altitude (above mean sea level):
Operating mode S1 (continuous operation)
The machine can be continuously operated with the
quoted power output.
Operating mode S2 (temporary operation)
The machine may be temporarily operated with the
quoted power output. Afterwards the machine must
be stopped for a while to prevent it from overheating.
Warning!
The specified vibration value was established in
accordance with a standardized testing method. It
may change according to how the electric equipment
is used and may exceed the specified value in
exceptional circumstances.
The specified vibration value can be used to compare
the equipment with other electric power tools.
The specified vibration value can be used for initial
assessment of a harmful effect.
14
Synchronous
IP 23M
5000W/400 V; 3300 W/230 V
100 W
50Hz
418 ccm
6.3 kW / (8.6 hp)
Diesel
16 liters
1.65 l (15W40)
136 kg
:
75 dB(A)
96 dB (A)
1 dB
G1
1000 m

6. Before starting the equipment

Important. The equipment must be filled with engine
oil and diesel fuel before it is started.
Prepare and connect the battery (Important. The
n
battery is not included.) Secure the battery (Fig.
4/Item A) in the unit using the battery mounting kit
(Fig. 3/Item 20). First connect the red cable (+)
and then the black cable (-) to the battery.
Check the diesel fuel level and top it up if
n
necessary.
Make sure that the device has sufficient
n
ventilation.
Inspect the immediate vicinity of the generator.
n
Disconnect any electrical equipment which may
n
already be connected to the generator.
Fitting the guide rollers
Caution! The equipment must stand securely on the
pallet. Make sure that the pallet was not damaged
during transport.
1. Fasten the two guide rollers (Fig. 1/Item 21) by
first fitting the 4 screws (Item 22) which are
accessible from the outside.
2. Use suitable handling equipment to lift the
generator from the pallet and place it on a firm
and level surface.
1
3. Fit the 4 screws which are accessible from the
inside.
6.1 Electrical safety:
Electric supply cables and connected equipment
n
must be in perfect condition.
The generator is to be operated only with
n
equipment whose voltage specifications conform
with the generator's output voltage.
Never connect the generator to the power supply
n
(socket-outlet).
Keep the cable length to the consumer as short
n
as possible.
6.2 Environmental protection
Dispose of soiled maintenance material and
n
operating materials at the appropriate collection
point.
Recycle packaging material, metal and plastics.
n

6.3 Connecting to earth

The housing is allowed to be connected to earth in
order to discharge static electricity. To do this, connect
one end of a cable to the earth connection on the
generator (Fig. 2/Item 14) and the other end to an
external earth (for example an earthing rod).

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

41.523.96

Inhaltsverzeichnis