Prog.
B
Cycle programming
Start time
9.00 h
Channel ON
A cycle switching command consists of: · Start time
Info
The time period between the start and end times must not be less than the period length.
An interlacing of cycle programs is not permitted.
Examples
The device is switched on for 10 minutes every 60 minutes between Monday 9.00 am and Friday
7.00 pm.
Start time Monday
ON switching period
Cycle length
End time Friday
Period
Length
Pause
· Length
· Period
· Cycle length = Length of time between channel ON and
9.00 am
10 min.
60 min.
7.00 pm
Cycle length
= ON switching period
= ON switching period + pause)
channel OFF
28
17.00 h
Channel OFF