Herunterladen Inhalt Inhalt Diese Seite drucken

Components; Front Panel; Operation; Charing Cable Storage - Mennekes Start (E) Betriebsanleitung

Ladestation für elektrofahrzeuge
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
3.6

Components

3.6.1 Front panel

Fig. 6: Front panel (example)
1
Multi-function button
Key switch (optional)
2
The control and display elements as well as the charging
socket of the charging station are located on the front panel.
The design of the front panel depends on the version of the
charging station.
7
3
LED info bar
Charging socket type 2
4
with hinged lid

4 Operation

Warning
Risk of injury
There is a risk of injury due to damage to the charging
system.
If it appears that the charging system cannot be operated
safely:
 Take the charging system out of service.
 Determine and eliminate any faults / malfunctions.
 See Chapter "Troubleshooting" on page 12 .
4.1

Charing cable storage

Fig. 7: Integrated charging cable storage
The design of the enclosure

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

ProBasic (e/r)LightStandard e

Inhaltsverzeichnis