Herunterladen Inhalt Inhalt Diese Seite drucken

ACO Lipumax-P Gebrauchsanleitung Seite 98

Vorschau ausblenden Andere Handbücher für Lipumax-P:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Grease separators Lipumax-P -B, -D, -DM, -DA
Installation
Connect on-site disposal pipe DN 65 to
Î
the connection pipe (OD 75 mm) on the
housing (e.g. with compression fitting).
Unscrew the union nut (4) from the
Î
compression fitting (1) and push over the
chamfered spigot end (3) of the on-site
disposal pipe (5).
Push the spigot end (3) into the socket
Î
(2) of the compression fitting (1).
Screw the union nut (4) onto the
Î
compression fitting (1) and tighten with a
suitable tool.
Ventilation connection (optional)
By using a ventilation connection, odour nuisance during the disposal process (displaced
air from the suction vehicle is discharged into the ambient air) can be avoided. The
ventilation connection can be laid separately above the roof or can be connected to the
on-site ventilation line.
There are no special requirements for
the ventilation connection.
Recommendation: use corrosion-
resistant materials (e.g. plastic pipes
made of PE, PP).
98/ 144
1
23
1
2
1 = Displaced air from the suction vehicle
2 = On-site ventilation connection above roof
3 = On-site ventilation connection connected to
on-site ventilation line
4 = On-site ventilation line
5 = Connection box (optional)
6 = On-site disposal pipe
2
3
4
5
3
4
5
6

Werbung

Kapitel

Inhaltsverzeichnis
loading

Verwandte Produkte für ACO Lipumax-P

Diese Anleitung auch für:

Lipumax-bLipumax-daLipumax-dLipumax-dm

Inhaltsverzeichnis