Herunterladen Inhalt Inhalt Diese Seite drucken

ACO Lipumax-P Gebrauchsanleitung Seite 106

Vorschau ausblenden Andere Handbücher für Lipumax-P:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Grease separators Lipumax-P -B, -D, -DM, -DA
Installation
IMPORTANT Before the load distribution slab is installed, the pit excavation must be
backfilled up to this level,
Measure dimension X (top of tank up to
Î
ground level).
Transfer dimension H (X - 340 + 115
Î
mm) onto the delivered top section and
cut at the nearest cutting joint.
Pull on the combination ring in the first
Î
and second groove from the bottom.
Smear the bottom area (round sealing
Î
surface) of the combination ring and the
surface of the "tank collar" with acid-free
grease.
Push the top section into the tank up to
Î
the "Combination ring stop" and align
horizontally.
Pull the sealing ring over the spigot.
Î
106/ 144
Chap. 3.3.11 „Backfill pit".

Werbung

Kapitel

Inhaltsverzeichnis
loading

Verwandte Produkte für ACO Lipumax-P

Diese Anleitung auch für:

Lipumax-bLipumax-daLipumax-dLipumax-dm

Inhaltsverzeichnis