Checklist for commissioning (properly qualified technician)
Tests & Inspections
General inspection
Installation work
Installation
Electrical fusing of the plant in accordance with the IEC regulations or national and local
regulations
Control: Operating voltage and frequency
Control: Functional test
Remote control: Functional test
HP pump: Rotational direction of pump motor
HP pump: Check oil level and oil basin ventilation
High-pressure inner cleaning: Functional test
HP head: Functional test
Filling device: Functional test
Disposal: Trial run with Lipumax-P -DM and -DA
Fault signalling equipment: LED fault displays, telecommunication equipment (group
alarm)
Water trap in the housing
Instruction (by installer company)
Instruction
Remarks
Functions, control, operating information, troubleshooting,
Instruction:
maintenance obligations
Handover:
Instructions for Use
Remarks:
Signature of properly qualified
technician:
Signature of authorised acceptance
inspection representative:
Grease separators Lipumax-P -B, -D, -DM, -DA
(no claim is made that the list is complete)
Appendix: Commissioning report
not
OK
OK
yes
no
143/ 144

Werbung

Kapitel

Inhaltsverzeichnis
loading

Verwandte Produkte für ACO Lipumax-P

Diese Anleitung auch für:

Lipumax-bLipumax-daLipumax-dLipumax-dm

Inhaltsverzeichnis